Car repair shop was changed from oil heating to geothermal in Ii.
Motivation was to reduce costs and to participate in saving the environment.

Angel Building The renovation project of the Angel Building was Derwent London’s largest redevelopment, completed in 2010, using Circular Economy concepts […]
Some of the standard seats were replaced with waterless urinals for the men’s toilets in Ii High School and Nättepori. This results […]
The street lighting control of the entire municipal area was renewed, totaling 65 control centers. The renewal of the control will enable […]
“IlmastoAreena” translates to ClimateArena According to Leena Vuotovesi, CEO of Micropolis Oy, a Finnish development company, ClimateArena was born from the company’s […]