Air heat pumps were installed in the electric heated nursery to save money in 2013.

Alaranta kindergarten
Asema and Ojakylä schools are involved in the EU project 50/50. In these schools energy groups were created to follow the school’s […]
The “Iisisti Energinen” project developed an “Energia Porinat”(meaning energy talk). The goal of this was to get close to municipal residents, associations […]
Door factory was transferred to geothermal heating. Hall was electrically heated and had water circulation before switching to geothermal. Annual consumption was […]
Alaranta school heating method was changed from oil to geothermal. The geothermal project was a successful and the monitoring of consumption has […]