Air heat pumps were installed in the electric heated nursery to save money in 2013.

Alaranta kindergarten
In the approximately 100m long corridor, the previously time-controlled (7-19) T8 fluorescent tubes were replaced with LEDs and a smart control was […]
A central kitchen was built very near of the health center. There is district heating in the area, but the central kitchen […]
Valtari School is located in the center of the municipality. The school has a secondary school and a high school. A real-time […]
In end of 2011, a real-time electrical monitoring system had been installed at the Ii municipal office. The night consumption of the […]