Ventilation maintenance in town hall, Ii

In end of 2011, a real-time electrical monitoring system had been installed at the Ii municipal office. The night consumption of the property was high. The object’s time control, or “egg clock”, had stalled, and ventilation was constantly on (time programs in automation OK).

Action: Repair of clock, set new temperature for strip heating, new ventilation runtime.

Ii town hall

Actors and projects

The leap archive of Ii.
The leap archive of project Towards Carbon Neutral Municipalities (Hinku).

Leave a comment

Voit etsiä loikkia yhdellä tai useammalla hakusanalla. Haku kohdistuu loikkien sisältöön ja metatietoihin, kuten kategorioihin, asiasanoihin ja sijaintiin. Hakemalla esimerkiksi "ilmastoloikka porvoo" löytyvät kaikki Porvoon kaupungista raportoidut ilmastoloikat. You can search for leaps matching one or more terms. The search targets both content and metadata such as categories, keywords, and location. For example, by searching for "climate leap Porvoo" you will find all the climate leaps reported in the city of Porvoo.