In end of 2011, a real-time electrical monitoring system had been installed at the Ii municipal office. The night consumption of the property was high. The object’s time control, or “egg clock”, had stalled, and ventilation was constantly on (time programs in automation OK).
Action: Repair of clock, set new temperature for strip heating, new ventilation runtime.