The old ventilation unit was replaced with a new heat recovery system equipped ventilation unit. The efficiency of machines is at least 70%. The motivation for the project was to improve the conditions and save energy.

Kindergarten of lakso in ii
Optimizing the magnetic flux of the frequency converters in the Micropolis property (31 units). Estimated reduction in energy consumption by 1.5 to […]
• In the background, the councils group initiative to improve public transport • The topic is also supported by a survey conducted […]
Ii is running a test of electric car sharing. A full electric car purchased for municipal staff working hours can be rented […]
The City of Hamina replaced the old fluorescent lighting of the Ruissalo sports hall with LED technology in autumn 2017. Before the […]