The old ventilation unit was replaced with a new heat recovery system equipped ventilation unit. The efficiency of machines is at least 70%. The motivation for the project was to improve the conditions and save energy.

Kindergarten of lakso in ii
In end of 2011, a real-time electrical monitoring system had been installed at the Ii municipal office. The night consumption of the […]
Finland’s first “food waste” grocery store selling only surplus food products opened its doors on 20.9.2018 in Helsinki. Finn Church Aid’s WeFood […]
In the approximately 100m long corridor, the previously time-controlled (7-19) T8 fluorescent tubes were replaced with LEDs and a smart control was […]
Valtari schools roof repair and additional heat insulation. The low part of the school’s flat roof was demolished and turned into a […]