Ii Hamina-, Alaranta- and Asema schools were switched to LEDs in 2013 and 2014. In Hamina, 50W spotlights were replaced with 10W LEDs. After good […]
Climate Leap (53)
The street lighting control of the entire municipal area was renewed, totaling 65 control centers. The renewal of the control will enable the control of […]
Air heat pumps were installed in the electric heated nursery to save money in 2013. Alaranta kindergarten
In end of 2011, a real-time electrical monitoring system had been installed at the Ii municipal office. The night consumption of the property was high. […]
Car repair shop was changed from oil heating to geothermal in Ii. Motivation was to reduce costs and to participate in saving the environment.
Pohjois-Ii School is a historical school along the main road north of the River Iijoki. The old side of the school was built in 1912, […]
A mobile real-time power monitoring system was installed in the commercial and industrial property owned by Ii Municipality, and 2 different compressed air compressors and […]
Alaranta school heating method was changed from oil to geothermal. The geothermal project was a successful and the monitoring of consumption has been done with […]