Raasakka industrial hall is electrically heated has air circulation and heat recovery system. In maintenance was discovered that old clock control of ventilation machine did […]
Valtari School is located in the center of the municipality. The school has a secondary school and a high school. A real-time electrical monitoring system […]
Changing “Asemankoulu” school heating method from oil to geothermal. Asemankoulu was built in 1959 (new half 1982), the heating network is original. Building volume 5440 […]
Some of the standard seats were replaced with waterless urinals for the men’s toilets in Ii High School and Nättepori. This results in annual savings […]
Ii is running a test of electric car sharing. A full electric car purchased for municipal staff working hours can be rented for private expenses […]
Ii will further strengthen its positive approach as a pioneer in renewable energy when the municipality, in cooperation with the real estate company Iilaakso Oy […]
Ii purchasing 5 electric cars
Hinku Award 4/2014
Municipality of Ii has been awarded with Hinku-act price for active, long-term and successful work for reducing the greenhouse gases. Ii is committed to reduce […]
The municipality of Ii has set a target to be 30 years …
Hinku Award 5/2018
We started testing solar energy in Ii with 10 kW electricity- and 10 kW heatproduction in 2014. The test results were surprisingly good (payback period […]
In the residential area of Hiukkavaara in Oulu, sustainable design of waste management was already taken into account at the planning stage. The block collection […]